Project: Peninsular Development Road (Laura – Coen)
Client: Department of Transport and Main Roads
Project Completion:November 2017

Description:

Koppens Developments Pty Ltd were appointed the successful Principal Contractor for the reconstruction of the Peninsula Developmental Road (Laura to Coen) between 222.684 and 244.694km from Laura. The road section is currently unsealed, the scope of works includes sealing of the existing gravel formation and comprises of earthworks, pavement, drainage and bitumen sealing works to provide an 8.5m wide bitumen sealed formation.

Scope:

The services scope required for the PDR Upgrade project involved the following:

  • Sealing of the existing gravel formation and comprised of earthworks
  • Pavement
  • Drainage and bitumen sealing work.
  • Traffic Management
  • Earthworks
  • Drainage
  • Pavement
  • Road Furniture
  • Bitumen Surfacing